The services shall entail provision of assistance to the Promoter in achieving the overall Project objective and to deliver the Project in an efficient, effective, coordinated, and sustainable way. The Technical Assistance should support PIU in successful implementation of the two Contracts for “Design and Construction of WWTP” and “Administration and Supervision of Construction of WWTP” in all the technical, administrative, financial, legal, environmental, and social management aspects. The Technical Assistance should assist PIU during the Construction period and the two years of Extended Trial Operation Period of the WWTP, advising and training PIU in all the aspects related to its duties and responsibilities as Employer according to Yellow Book FIDIC Conditions of Contract 1st edition.
Рок
Рокот за прием на понудите беше 2022-07-11.
Набавката беше објавена на 2022-06-03.
Добавувачи
Следните добавувачи се споменати во одлуките за доделување или други документи за набавка:
Оглас за договор (2022-06-03) Предмет Опсег на набавката
Наслов: Consulting services for water-supply and waste consultancy
Референтен број: EIB-GtP/ENR/2019/S 086-204758
Краток опис:
The services shall entail provision of assistance to the Promoter in achieving the overall Project objective and to deliver the Project in an efficient, effective, coordinated, and sustainable way. The Technical Assistance should support PIU in successful implementation of the two Contracts for “Design and Construction of WWTP” and “Administration and Supervision of Construction of WWTP” in all the technical, administrative, financial, legal, environmental, and social management aspects.
The Technical Assistance should assist PIU during the Construction period and the two years of Extended Trial Operation Period of the WWTP, advising and training PIU in all the aspects related to its duties and responsibilities as Employer according to Yellow Book FIDIC Conditions of Contract 1st edition.
The services shall entail provision of assistance to the Promoter in achieving the overall Project objective and to deliver the Project in an efficient, effective, coordinated, and sustainable way. The Technical Assistance should support PIU in successful implementation of the two Contracts for “Design and Construction of WWTP” and “Administration and Supervision of Construction of WWTP” in all the technical, administrative, financial, legal, environmental, and social management aspects.
The Technical Assistance should assist PIU during the Construction period and the two years of Extended Trial Operation Period of the WWTP, advising and training PIU in all the aspects related to its duties and responsibilities as Employer according to Yellow Book FIDIC Conditions of Contract 1st edition.
Метаподатоци на огласот
Оригинален јазик: англиски 🗣️
Вид на документ: Оглас за договор
Природа на договорот: Услуги
Регулатива: Не е наведено
Заеднички речник на набавки (CPV)
Шифра: Советодавни услуги за водоснабдување и отпад📦 Место на извршување
NUTS регион: Северна Македонија
🏙️
Постапка
Вид на постапка: Ограничена постапка
Вид на понуда: Поднесување за сите делови
Критериуми за доделување
Економски најповолна понуда
Договорен орган Идентитет
Земја: Северна Македонија 🇲🇰
Вид на органот кој доделува: Министерство или кој било друг национален или федерален орган
Име на органот кој доделува: PE “Vodovod I Kanalizacija – Skopje” (“Water supply and sewerage – Skopje”)
Поштенска адреса: St. Lazar Lichenovski, no.9
Поштенски број: 1000
Поштенско место: Skopje
Контакт
Интернет-адреса: https://www.vodovod-skopje.com.mk/🌏
Е-пошта: lindita.atanasova@vodovod-skopje.com.mk📧
Телефон: +389 71233623📞
URL за документи: https://www.vodovod-skopje.com.mk/🌏
Референца Датуми
Датум на испраќање: 2022-06-03 📅
Рок за поднесување: 2022-07-11 📅
Датум на објавување: 2022-06-10 📅
Идентификатори
Број на огласот: 2022/S 111-309679
Се однесува на оглас: 2022/S 096-264002
OJ-S издание: 111
Дополнителни информации
The Skopje WWTP Project is expected to start the implementation in last quarter of 2022 with duration of 72 months including the Defect Notification Period. At the moment, the Project is in a procurement of the Works and Services contracts. The procurement stage is expected to be finalised in the third quarter of 2022.
The Skopje WWTP Project is expected to start the implementation in last quarter of 2022 with duration of 72 months including the Defect Notification Period. At the moment, the Project is in a procurement of the Works and Services contracts. The procurement stage is expected to be finalised in the third quarter of 2022.
Предмет Опсег на набавката
Краток опис:
The services shall entail provision of assistance to the Promoter in achieving the overall Project objective and to deliver the Project in an efficient, effective, coordinated, and sustainable way. The Technical Assistance should support PIU in successful implementation of the two Contracts for “Design and Construction of WWTP” and “Administration and Supervision of Construction of WWTP” in all the technical, administrative, financial, legal, environmental, and social management aspects.
The services shall entail provision of assistance to the Promoter in achieving the overall Project objective and to deliver the Project in an efficient, effective, coordinated, and sustainable way. The Technical Assistance should support PIU in successful implementation of the two Contracts for “Design and Construction of WWTP” and “Administration and Supervision of Construction of WWTP” in all the technical, administrative, financial, legal, environmental, and social management aspects.
The Technical Assistance should assist PIU during the Construction period and the two years of Extended Trial Operation Period of the WWTP, advising and training PIU in all the aspects related to its duties and responsibilities as Employer according to Yellow Book FIDIC Conditions of Contract 1st edition.
The Technical Assistance should assist PIU during the Construction period and the two years of Extended Trial Operation Period of the WWTP, advising and training PIU in all the aspects related to its duties and responsibilities as Employer according to Yellow Book FIDIC Conditions of Contract 1st edition.
The TA Contract is expected to commence in Q4 2022, and its duration will be 5 years (60 months), in parallel with the “Contract for the Design and Construction of WWTP” and the contract of “Administration and Supervision of Construction of WWTP”, here below briefly described that are at the moment in the phase of Tender Evaluation and that will be both awarded by the end of 2022.
The TA Contract is expected to commence in Q4 2022, and its duration will be 5 years (60 months), in parallel with the “Contract for the Design and Construction of WWTP” and the contract of “Administration and Supervision of Construction of WWTP”, here below briefly described that are at the moment in the phase of Tender Evaluation and that will be both awarded by the end of 2022.
The contract will be procured under restricted procedure. The Prequalification Document shall be prepared following the Guide to Procurement for projects financed by European Investment Bank (EIB). The European Investment bank will monitor the compliance with the Guide to Procurement. EBRD’s standard Procurement Document for prequalification will be used. The contract will be modelled upon the EBRD Standard Form of Contract for Consultancy Services (lump-sum). Funds will be provided by grant financing by Western Balkan Investment Framework (WBIF).
The contract will be procured under restricted procedure. The Prequalification Document shall be prepared following the Guide to Procurement for projects financed by European Investment Bank (EIB). The European Investment bank will monitor the compliance with the Guide to Procurement. EBRD’s standard Procurement Document for prequalification will be used. The contract will be modelled upon the EBRD Standard Form of Contract for Consultancy Services (lump-sum). Funds will be provided by grant financing by Western Balkan Investment Framework (WBIF).
The criteria for prequalification are as follows:
1. General Experience
The annual turnover of the candidate for each of the last 3 financial years (2019, 2020, 2021) must be at least 1,000.000,00 EUR.
The turnover value in currencies other than EUR, shall be presented in EUR based on the exchange rate set by the central/national bank of the applicant's country, as of 1st July of each year reported.
2. Specific Expirience
The candidate (individual company or consortium altogether) has successfully completed, at any time between 1st January 2017 up to the deadline of submission of applications, either a) alone, b) as leader of a consortium, or c) as a member of a consortium, the following project references:
The candidate (individual company or consortium altogether) has successfully completed, at any time between 1st January 2017 up to the deadline of submission of applications, either a) alone, b) as leader of a consortium, or c) as a member of a consortium, the following project references:
a) At least 2 service contracts of a minimum value of EUR 500,000 each, with activities related to the support to Promoters during the contracting and implementation of the wastewater treatment projects financed by loans of International Financing Institutions / EU grants.
a) At least 2 service contracts of a minimum value of EUR 500,000 each, with activities related to the support to Promoters during the contracting and implementation of the wastewater treatment projects financed by loans of International Financing Institutions / EU grants.
b) At least 1 service contract with activities related to the support to Promoters during the implementation of the infrastructure project of a minimum value of EUR 40,000,000.
The prequalification of a JVCA does not mean that any of its partners individually, or as a partner in any other JVCA, are prequalified.
3. Professional Capacity of the Applicant
The applicant must have a total of at least ten (10) permanent staff currently working for the applicant in fields related to the contract as described in point 2 and at least 3 engineers with experience in supervision or technical assistance in fields related to the contract as described in point 2.
The applicant must have a total of at least ten (10) permanent staff currently working for the applicant in fields related to the contract as described in point 2 and at least 3 engineers with experience in supervision or technical assistance in fields related to the contract as described in point 2.
4. Non-performance History
A consistent history of litigation and/or arbitration awards against the applicant or any partner of a joint venture or their non-performance under the contracts may result in failure of the application. Moreover, an applicant shall Declare any contracts that have been suspended or terminated and/or performance security called by a Promoter for reasons related to the noncompliance of any environmental, or social, or health or safety requirements or safeguard in the past 5 (five) years.
A consistent history of litigation and/or arbitration awards against the applicant or any partner of a joint venture or their non-performance under the contracts may result in failure of the application. Moreover, an applicant shall Declare any contracts that have been suspended or terminated and/or performance security called by a Promoter for reasons related to the noncompliance of any environmental, or social, or health or safety requirements or safeguard in the past 5 (five) years.
The original Application shall be submitted in hard copy. In addition to the original of the application, the applicant shall submit 3 (three) hard copies, and 1 (one) scanned electronic copy of the original in portable document format. Applicants submitting applications in hard copy shall enclose the original and copies of the applications in separate sealed envelopes. The envelopes shall be duly marked as “ORIGINAL” and “COPY”. These envelopes shall then be enclosed in one single package.
The original Application shall be submitted in hard copy. In addition to the original of the application, the applicant shall submit 3 (three) hard copies, and 1 (one) scanned electronic copy of the original in portable document format. Applicants submitting applications in hard copy shall enclose the original and copies of the applications in separate sealed envelopes. The envelopes shall be duly marked as “ORIGINAL” and “COPY”. These envelopes shall then be enclosed in one single package.
Времетраење: 60 месеци
Име на проектот или програмата финансирани од ЕУ: The Western Balkans Investment Framework (WBIF) supports socio-economic development and EU accession across the Western Balkans through the provision of finance and technical assistance for strategic investments. It is a joint initiative of the EU, financial institutions, bilateral donors and the governments of the Western Balkans.
Дополнителни информации:
The Skopje WWTP Project is expected to start the implementation in last quarter of 2022 with duration of 72 months including the Defect Notification Period. At the moment, the Project is in a procurement of the Works and Services contracts. The procurement stage is expected to be finalised in the third quarter of 2022.
The Skopje WWTP Project is expected to start the implementation in last quarter of 2022 with duration of 72 months including the Defect Notification Period. At the moment, the Project is in a procurement of the Works and Services contracts. The procurement stage is expected to be finalised in the third quarter of 2022.
Место на извршување
Главна локација или место на извршување:
The site is located in the southeaster part of the City of Skopje in the settlement of Trubarevo (Municipality of “Gazi Baba”). The TA team may be required to visit the site as per the Project needs.
Постапка
Друга правна основа: This contract will be financed by the European Investment Bank (EIB) and subject to EIB's Guide to Procurement.
Минимален број на кандидати: 3
Максимален број на кандидати: 8
Објективни критериуми за избор на ограничениот број кандидати:
On the basis of the applications received, at least 3 and at most 8 candidates will be invited to submit detailed tenders for this contract.
In case of less than 3 candidates, the Pre-Qualification procedure will be cancelled.
If more than 8 eligible candidates meet the above selection criteria, the relative strengths and weaknesses of the applications of these candidates must be re-examined to identify the eight best candidates. The only additional comparative criteria which will be taken into consideration during this re-examination will be based on project references, in the order that they appear below:
Објективни критериуми за избор на ограничениот број кандидати
If more than 8 eligible candidates meet the above selection criteria, the relative strengths and weaknesses of the applications of these candidates must be re-examined to identify the eight best candidates. The only additional comparative criteria which will be taken into consideration during this re-examination will be based on project references, in the order that they appear below:
1. the total number of project references found eligible under the above selection criteria, then, in case of equality of this criterion
2. the total value of project references found eligible the above selection criteria
Note: additional comparative criterion 2) will be applied only if the number of eligible candidates remain higher than 8 after applying additional comparative criterion 1.
Време за прием на понуди: 12:00
Датум на испраќање на поканите: 2022-09-01 📅
Јазици на кои може да се поднесат понуди или барања за учество: англиски 🗣️
Дополнителни информации Тело за преглед
Име: Remedy commission for complaints for the Skopje WWTP Project.
Поштенско место: Skopje
Земја: Северна Македонија 🇲🇰
Извор: OJS 2022/S 111-309679 (2022-06-03)
Дополнителни информации (2022-07-04) Предмет Метаподатоци на огласот
Вид на документ: Дополнителни информации
Референца Датуми
Датум на испраќање: 2022-07-04 📅
Рок за поднесување: 2022-07-18 📅
Датум на објавување: 2022-07-08 📅
Идентификатори
Број на огласот: 2022/S 130-366490
Се однесува на оглас: 2022/S 111-309679
OJ-S издание: 130
Извор: OJS 2022/S 130-366490 (2022-07-04)
Оглас за доделување договор (2024-12-06) Предмет Опсег на набавката
Наслов: Consultant Services for Technical Assistance during implementation phase to the Skopje Wastewater Treatment Plant, North Macedonia
Референтен број: EIB-GtP/2019/S 086-204758 – RFP/PIU/TA
Краток опис:
The objective of this assignment is for the Consultant to support the Promoter/PIU in all aspects of the implementation and administration of the Works and Service Contracts (hereinafter referred to as “the Contracts”) and all responsibilities arising from the Project Implementation Agreement, respective Financing Agreements and any eventual contracts that could appear during the implementation of the Project and to assist the Promoter in carrying out the duties assigned to him, as defined in the FIDIC Conditions of Works and Service of Contract.
The Consultant shall provide support to the Promoter/PIU in the overall management and implementation of the Project, to the point at which the Contract for the design and construction of the WWTP is expected to be completed.
The objective of this assignment is for the Consultant to support the Promoter/PIU in all aspects of the implementation and administration of the Works and Service Contracts (hereinafter referred to as “the Contracts”) and all responsibilities arising from the Project Implementation Agreement, respective Financing Agreements and any eventual contracts that could appear during the implementation of the Project and to assist the Promoter in carrying out the duties assigned to him, as defined in the FIDIC Conditions of Works and Service of Contract.
The Consultant shall provide support to the Promoter/PIU in the overall management and implementation of the Project, to the point at which the Contract for the design and construction of the WWTP is expected to be completed.
Вид на договорот: Услуги
Производи/услуги: Советодавни услуги за водоснабдување и отпад📦
Вкупна вредност на набавката (без ДДВ): 1 490 570 EUR 💰
Опис
Внатрешен идентификатор: EIB-GtP/2019/S 086-204758 – RFP/PIU/TA
Главна локација или место на извршување:
The Ministry of Environment and Physical Planning of North Macedonia (MoEPP), City of Skopje and Public Enterprise Vodovod i Kanalizacija Skopje (“ViK”) a municipal company in the City of Skopje, have secured a grant, from the Western Balkans Investment Framework (WBIF), funds that will be managed through the European Investment Bank (EIB), to finance a Technical Assistance during the implementation of the Skopje WWTP Project.
The Bank and the Promoter have agreed that this tender process is governed by the European Investment Bank’s “Guide to Procurement for projects financed by the EIB”, as published on the website of the Bank. “The Beneficiary of the Project, the Public Utility Company (PUC) “Vodovod I Kanalizacija of Skopje” (operating though the Project Implementation Unit (PIU) established within the PUC) intends to engage a consultant (the “Consultant”) that shall provide Technical Assistance to the PIU during the implementation of the Skopje WWTP Project (excluding the Defect Notification Period).
The objective of this assignment is for the Consultant to support the Promoter/PIU in all aspects of the implementation and administration of the Works and Service Contracts (hereinafter referred to as “the Contracts”) and all responsibilities arising from the Project Implementation Agreement, respective Financing Agreements and any eventual contracts that could appear during the implementation of the Project and to assist the Promoter in carrying out the duties assigned to him, as defined in the FIDIC Conditions of Works and Service of Contract. Said Technical Assistance should assist the PIU during the design, construction and extended trial operation periods, advising and training PIU in all the aspects related to its duties and responsibilities as Employer of the Yellow Book FIDIC Contract, as well as in accomplishing Promoters duties and responsibilities in line with the Finance Contracts and Project Implementation Agreements. The Technical Assistance will have to provide a range of support services, system development, expertise and training to the management and staff of the PIU and the PUC. This will lead to improved managerial and operational efficiency and strengthen their corporate position.
The duration of the Technical Assistance Contract will be 5 years, coinciding with the start of the construction phase of the Works Contract but excluding the Defect Notification Period. The Technical Assistance Contract will end anyway with the Taking Over of Work’s Contract (at the end of Extended Trial Operation Period of duration of two years).
The Ministry of Environment and Physical Planning of North Macedonia (MoEPP), City of Skopje and Public Enterprise Vodovod i Kanalizacija Skopje (“ViK”) a municipal company in the City of Skopje, have secured a grant, from the Western Balkans Investment Framework (WBIF), funds that will be managed through the European Investment Bank (EIB), to finance a Technical Assistance during the implementation of the Skopje WWTP Project.
The Bank and the Promoter have agreed that this tender process is governed by the European Investment Bank’s “Guide to Procurement for projects financed by the EIB”, as published on the website of the Bank. “The Beneficiary of the Project, the Public Utility Company (PUC) “Vodovod I Kanalizacija of Skopje” (operating though the Project Implementation Unit (PIU) established within the PUC) intends to engage a consultant (the “Consultant”) that shall provide Technical Assistance to the PIU during the implementation of the Skopje WWTP Project (excluding the Defect Notification Period).
The objective of this assignment is for the Consultant to support the Promoter/PIU in all aspects of the implementation and administration of the Works and Service Contracts (hereinafter referred to as “the Contracts”) and all responsibilities arising from the Project Implementation Agreement, respective Financing Agreements and any eventual contracts that could appear during the implementation of the Project and to assist the Promoter in carrying out the duties assigned to him, as defined in the FIDIC Conditions of Works and Service of Contract. Said Technical Assistance should assist the PIU during the design, construction and extended trial operation periods, advising and training PIU in all the aspects related to its duties and responsibilities as Employer of the Yellow Book FIDIC Contract, as well as in accomplishing Promoters duties and responsibilities in line with the Finance Contracts and Project Implementation Agreements. The Technical Assistance will have to provide a range of support services, system development, expertise and training to the management and staff of the PIU and the PUC. This will lead to improved managerial and operational efficiency and strengthen their corporate position.
The duration of the Technical Assistance Contract will be 5 years, coinciding with the start of the construction phase of the Works Contract but excluding the Defect Notification Period. The Technical Assistance Contract will end anyway with the Taking Over of Work’s Contract (at the end of Extended Trial Operation Period of duration of two years).
Поштенска адреса: The Plant site is located in the southeaster part of the City of Skopje in the settlement of Trubarevo (Municipality of “Gazi Baba”).
Град: Skopje
Земја: Северна Македонија 🇲🇰
Место на извршување: Extra-Regio NUTS 3
🏙️
Времетраење: 5 години Критериуми за доделување
Критериум за квалитет (назив): Technical Score - Weighting 80%
1. Organization and Methodology: TOTAL 40 Points
2. Rational : Weighting 10
3. Strategy: Weighting 20
4. Backstopping and involvement of all members of the consortium: Weighting 5
5. Timetable of activities: Weighting 5
6. Key Experts: TOTAL 60 Points
7. KE 1 – Team Leader: Weighting 20
8. KE 2 - Technical Expert WWTPs: Weighting 20
9. KE 3 - Financial and Administrative Expert: Weighting 20
Критериум за квалитет (тежина): 100
Критериум за трошок (назив): The weights given to the Technical (T) and Financial (P) Proposals are:
T = 80 (eighty), and P = 20 (twenty)
Критериум за трошок (тежина): 100
Наслов
Идентификациски број на делот: LOT-0001 Опис
Град: The Plant site is located in the southeaster part of the City of Skopje in the settlement of Trubarevo (Municipality of “Gazi Baba”).
Постапка Вид на постапката
Ограничена постапка ✅
Правна основа: Друго
Критериуми за доделување
Тип на тежина: Тежина (поени, точна)
Доделување договор
Се доделува договор/дел ✅
Идентификациски број на делот: LOT-0001
Број на договор: 0302-4346/7
Датум на склучување на договорот: 2024-12-02 📅
Информации за понудите
Број на примените понуди: 3
Информации за вредноста на договорот/делот (без ДДВ)
Вкупна вредност на договорот/делот: 1 490 570 EUR 💰
Позиција во листата на победници: 1
Идентификатор на понудата: Consultant Services for Technical Assistance during implementation phase to the Skopje Wastewater Treatment Plant, North Macedonia
Идентификатор на лот или група на лотови: LOT-0001 Име и адреса на изведувачот
Име: Antea France
Национален регистарски број: Consultancy Firm
Поштенска адреса: Immeuble Antony Parc 1, 2-6 place du General de Gaulle, 92160 Antony
Поштенски број: 92160
Поштенско место: Paris
Регион: Paris
🏙️
Земја: Франција 🇫🇷
Е-пошта: secretariat-int@anteagroup.fr📧
Телефон: +33 157631376📞
Факс: +33 157631401 📠
URL: www.anteagroup.fr🌏
Договорен орган Име и адреси
Име: PE “Vodovod I Kanalizacija – Skopje” (“Water supply and sewerage – Skopje”)
Национален регистарски број: Ministry
Поштенска адреса: Str. Lazar Lichenoski n.9
Поштенски број: 1000
Поштенско место: Skopje
Регион: Extra-Regio NUTS 3
🏙️
Земја: Северна Македонија 🇲🇰
Е-пошта: zarko.ivanovic@vodovod-skopje.com.mk📧
Телефон: +38 971268038📞
URL: https://www.vodovod-skopje.com.mk/🌏 Вид на договорниот орган
Министерство или кој било друг национален или федерален орган
Главна дејност
Општи јавни услуги
Комуникација
Идентификатор на претходниот оглас: 309679-2022
Дополнителни информации Тело за преглед
Име: State Commission for Public Procurement Appeals
Национален регистарски број: Government Commission
Поштенска адреса: St. Filip II Makedonski number 11 floor 4
Поштенски број: 1000
Регион: Extra-Regio NUTS 3
🏙️ Постапка за преглед
Точни информации за рокот(овите) за постапки за преглед: n.a.
Информации за известувањето
Преферирана дата на објавување: 2024-12-09Z 📅
Извор: OJS 2024/S 239-750866 (2024-12-06)