Набавки: Изградба на железници и жичарници
Една активна набавка
Изградба на железници и жичарници ги набавувале организации како Ministry of Finance, Central Financing and Contracting Department (CFCD) и Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI).
- Градежни работи (3 нови набавки)
- Целосна или делумна изградба и работи во нискоградба (3)
- Изградба на цевководи, комуникациски и електроенергетски водови, автопати, патишта, аеродроми и железници; рамни работи (1)
- Изградба на железници и жичарници (1) ⬅️
Неодамнешни набавки на изградба на железници и жичарници во Северна Македонија
2026-09-22
Deadline 2027-01-20
Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII (Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI))
The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, … Прикажи ја набавката »
The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, … Прикажи ја набавката »
2023-12-21
Construction of new railway section from Kriva Palanka to the border with Republic of Bulgaria, as part of Corridor VIII (Ministry of Finance, Central Financing and Contracting Department (CFCD))
The project consists in provision of detailed design, NoBo (Notified Body -an independent body,whose competences for performing a conformity assessment for one or more TSIs have been notified to the European Commission by a Member State) certification,revision, obtaining construction permit, and construction of new railway section from Kriva Palanka to the border with the Republic of Bulgaria, under FIDIC Conditions of Contract, Yellow Book (1999). Detailed design and construction of a new railway … Прикажи ја набавката »
The project consists in provision of detailed design, NoBo (Notified Body -an independent body,whose competences for performing a conformity assessment for one or more TSIs have been notified to the European Commission by a Member State) certification,revision, obtaining construction permit, and construction of new railway section from Kriva Palanka to the border with the Republic of Bulgaria, under FIDIC Conditions of Contract, Yellow Book (1999). Detailed design and construction of a new railway … Прикажи ја набавката »